亚洲高清免费观看_亚拍精品一区二区三区探花_国产午夜三级小视频_高清不卡A级毛片_白丝JK高潮喷水在线观看_黄色影院在线_妖精视频在线_日韩永久免费无码AV电影_美女无遮挡黄色网站_超级不卡无码

Electrostatic coating equipment

Categories Of News

Product Categories

Hot Keywords

Contact Us

Address: No. 188, Xin Zhan North Road, Zhangjiagang, Jiangsu

Contact: Mr. Cao

Cell phone: 13806227123

Phone: 0512-58968100

Fax: 0512-58968100

Zip code: 215600

E-mail:1197414559@qq.com

Web site: 59mq.cn





Painting equipment maintenance instruction

Location: Index >> News >> Company news

Painting equipment maintenance instruction

Release date:2017-05-15 Author:http://59mq.cn/en Clicks:

3.jpg

Suzhou Powder coating equipment maintenance instructions

Painting line

1.1 painting each air supply, exhaust pipe, every day should check their tightness, not leakage, leakage.

1.2 room top filter cotton should be checked regularly, dust removal or replacement in time. Clean up once every March and change once a year.

1.3, in the circulating pool regularly add paint fog coagulant, filter, sink, grille should often clean up (every week). Paint mist coagulant once every two months.

1.4 fan belt replaced every six months (also depending on the production situation).

1.5 polishing and cleaning the interior filter bags, once every two weeks (depending on the production situation).

The 1.6 painting fan motor lubricating way (Huang You) cup monthly round (cup to refuel), add lubricating oil every three months refueling time, hit Huang You lubrication every two months refueling time.

Two, product release chain

2.1, put chain guide, roller lubrication plus butter, every six months plus (can be carried out in batches).

2.2, put chain car, duck head with butter lubrication, every six months plus.

2.3, put chain, chain spray lubrication, spray lubrication once a week, the time may not be less than four hours. (fuel tank needs oil in time)

2.4 the fixed bolts of the driving device of the release chain are checked once a month

2.5 the chain shall be connected with the fixed bolts, and the running condition should be observed every day.

Three, ground chain

3.1 ground chain drive station drive sprocket, add lubricating oil once a month, drive chain every two months plus oil once.

3.2, the ground chain cover inspection once a week, such as cover plate deformation should be leveled in time.

3.3, the ground chain car fixed pin inspection every day, each car in the assembly on the heavy line, first check whether the fixed pin is in the chain drive position


Recently Viewed:

s
e
r
v
i
c
e
share